15.1.B.23-23-501 15 CAR § 23-501. General standards
0.5K chars
15 CAR § 23-501. General standards. (a) All dams must be designed in accordance with currently accepted engineering practices. (b) Acceptable guidelines include those published and recommended by the: (1) United States Army Corps of Engineers; (2) United States Department of Agri…
15.1.B.23-23-502 15 CAR § 23-502. Registered professional engineer
0.3K chars
15 CAR § 23-502. Registered professional engineer. Preparation of all plans and specifications and the construction, enlargement, alteration, repair, or removal of dams subject to Arkansas Natural Resources Commission review shall be under the supervision of an engineer registere…
15.1.B.23-23-503 15 CAR § 23-503. Size classification criteria
0.4K chars
15 CAR § 23-503. Size classification criteria. Size classification is based on the more stringent of two (2) categories, either height of dam or maximum storage, and shall be in accordance with Table 1 of this section. Table 1Size Classification SizeMaximum storage (acre-feet)Hei…
15.1.B.23-23-504 15 CAR § 23-504. Hazard classification criteria
1.0K chars
15 CAR § 23-504. Hazard classification criteria. (a) All dams will be classified or reclassified as required to ensure appropriate safety considerations. (b) Hazard classification shall be based on the more stringent of either potential loss of human life or economic loss in acco…
15.1.B.23-23-505 15 CAR § 23-505. Spillway design flood (SDF) for dams
1.2K chars
15 CAR § 23-505. Spillway design flood (SDF) for dams. (a) The size and hazard classifications are combined to determine the hydrologic criteria for dams. (b) The minimum acceptable spillway design floods (SDFs) for dams are shown in Table 3. (c) The minimum hydrologic criteria m…
15.1.B.23-23-506 15 CAR § 23-506. Downstream releases
0.5K chars
15 CAR § 23-506. Downstream releases. (a) Each dam constructed after the effective date of this part shall be equipped with a release port or ports designed to release a flow of water for instream and downstream riparian uses. (b) Minimum release quantities shall be: (1) Sufficie…
15.1.B.23-23-507 15 CAR § 23-507. Reservoir drain conduit
0.8K chars
15 CAR § 23-507. Reservoir drain conduit. (a) All proposed dams must include a permanent facility for draining the reservoir. (b)(1) Such conduit shall have a minimum diameter of: (A) Twelve inches (12”) for watershed areas less than one (1) square mile; and (B) Eighteen inches (…
15.1.B.23-23-508 15 CAR § 23-508. Structural criteria
0.7K chars
15 CAR § 23-508. Structural criteria. As a minimum, the design must address the following: (1) Slope stability under all probable loading conditions; (2) Stability against sliding and overturning; (3) Adequacy of foundation for imposed loads; (4) Adequacy of energy dissipating de…
15.1.B.23-23-601 15 CAR § 23-601. Plans and specifications
0.2K chars
15 CAR § 23-601. Plans and specifications. Written approval of plans and specifications must be obtained from the Chief Engineer of the Arkansas Natural Resources Commission prior to start of construction.
15.1.B.23-23-602 15 CAR § 23-602. Construction inspections
0.2K chars
15 CAR § 23-602. Construction inspections. An agent of the design-registered professional engineer must be on site during construction to ensure that techniques and materials used comply with plans and specifications.
15.1.B.23-23-603 15 CAR § 23-603. Construction records
0.7K chars
15 CAR § 23-603. Construction records. (a) The applicant (or applicant’s engineer) must retain construction records throughout the life of the dam. (b) As a minimum, the records must include: (1) Daily log of construction activities; (2) Record of personnel and equipment on site;…
15.1.B.23-23-604 15 CAR § 23-604. Erosion protection
0.5K chars
15 CAR § 23-604. Erosion protection. (a) During construction, adequate measures must be taken to prevent excessive erosion and off-site sedimentation. (b) Suitable techniques include: (1) Temporary vegetation; (2) Mulching; (3) Staked straw bales; (4) Filter fences; and (5) Chemi…
15.1.B.23-23-605 15 CAR § 23-605. Final inspection
0.2K chars
15 CAR § 23-605. Final inspection. Upon substantial completion of construction, the owner must: (1) Notify the Arkansas Natural Resources Commission; and (2) Schedule a final inspection of the work.
15.1.B.23-23-606 15 CAR § 23-606. Engineer’s certification
0.2K chars
15 CAR § 23-606. Engineer’s certification. Upon completion of construction, the project engineer shall file with the Arkansas Natural Resources Commission a certificate of substantial compliance with approved plans and specifications.
15.1.B.23-23-607 15 CAR § 23-607. Record drawings
0.3K chars
15 CAR § 23-607. Record drawings. Within sixty (60) days after completion of construction, the owner or his or her engineer shall submit to the Chief Engineer of the Arkansas Natural Resources Commission a complete set of record drawings of the project for filing as a permanent r…
15.1.B.23-23-608 15 CAR § 23-608. Permanent reference marks
0.3K chars
15 CAR § 23-608. Permanent reference marks. (a) Two (2) or more permanent reference marks shall be established for future use near but not on the dam. (b) Accurate longitude, latitude, and elevation shall be shown on the record drawings. (c) Elevations shall be referenced to the …
15.1.B.23-23-701 15 CAR § 23-701. Types of evaluations
1.9K chars
15 CAR § 23-701. Types of evaluations. (a) Spillway design flood. (1) Existing dams will be evaluated periodically to determine if development of downstream areas warrants: (A) Change in hazard classification; and (B) Review of spillway design flood (SDF). (2) Overtopping during …
15.1.B.23-23-702 15 CAR § 23-702. Deficiencies
0.2K chars
15 CAR § 23-702. Deficiencies. Dams not meeting minimum acceptable standards (see Subparts 5 and 8 of this part) are deemed inadequate and therefore subject to necessary action under Subpart 4 of this part.
15.1.B.23-23-703 15 CAR § 23-703. Interim alternatives
0.8K chars
15 CAR § 23-703. Interim alternatives. (a) When the Arkansas Natural Resources Commission considers the permanent upgrading or removal of an inadequate dam, the dam owner may request the commission to consider interim alternatives including, but not limited to: (1) Temporary repa…
15.1.B.23-23-704 15 CAR § 23-704. Variance
0.6K chars
15 CAR § 23-704. Variance. (a) Upon request by the owner of an existing dam that does not meet the minimum acceptable standards stated in Subparts 5 and 8 of this part, the Chief Engineer of the Arkansas Natural Resources Commission may authorize a variance from this criteria. (b…
15.1.B.23-23-801 15 CAR § 23-801. Compliance with approved documents
0.2K chars
15 CAR § 23-801. Compliance with approved documents. Operation and maintenance must be performed in accord with documents filed by the owner or owner’s engineer in obtaining the dam permit.
15.1.B.23-23-802 15 CAR § 23-802. Erosion protection
0.2K chars
15 CAR § 23-802. Erosion protection. Maintenance of adequate means to protect embankments, abutments, crests, and earthen channels from erosion is required.
15.1.B.23-23-803 15 CAR § 23-803. Woody vegetation prohibited — Embankment dams
2.0K chars
15 CAR § 23-803. Woody vegetation prohibited — Embankment dams. (a) Growth of woody vegetation is not permitted: (1) On the spillway, crest, upstream or downstream embankments; and (2) Within twenty feet (20’) of the downstream toe or groin of the dam. (b) Remediation. (1) Trees …
15.1.B.23-23-804 15 CAR § 23-804. Woody vegetation prohibited — Concrete or masonry dams
0.7K chars
15 CAR § 23-804. Woody vegetation prohibited — Concrete or masonry dams. (a) No grass, vines, brush, trees, or other vegetation is permitted to grow in cracks or joints of concrete or masonry structures. (b) Remediation. (1) Vegetation shall be removed by: (A) Manual, mechanical,…
15.1.B.23-23-805 15 CAR § 23-805. Operation of gates and controls
0.5K chars
15 CAR § 23-805. Operation of gates and controls. (a) All gates, valves, and controls must be maintained in operational condition. (b) Operation of each such item must be tested at least annually, and such tests must be documented in the owner’s permanent records. (c) However, te…
15.1.B.23-23-806 15 CAR § 23-806. Repairs and modifications
0.3K chars
15 CAR § 23-806. Repairs and modifications. (a) Written approval by the Chief Engineer of the Arkansas Natural Resources Commission is required before repairs or modifications to a dam or appurtenances may be undertaken. (b) Plans and specifications prepared by a registered profe…
15.1.B.23-23-807 15 CAR § 23-807. Records
0.2K chars
15 CAR § 23-807. Records. Documentation of all owner’s inspections and repairs or modifications to the dam or appurtenances must be retained by the owner.
15.1.B.23-23-901 15 CAR § 23-901. Owner inspection
0.8K chars
15 CAR § 23-901. Owner inspection. (a) At least once per year and after each major storm event, the owner or owner’s agent of all permitted dams must perform a visual inspection of the dam. (b) Results of such inspections must be: (1) Summarized on forms supplied by the Arkansas …
15.1.B.23-23-902 15 CAR § 23-902. Commission inspection
0.6K chars
15 CAR § 23-902. Commission inspection. (a) Arkansas Natural Resources Commission personnel will periodically perform inspections of each permitted dam. (b) Commission inspections are of three (3) types: (1) Maintenance and Operation; (2) Dam Safety Evaluation; and (3) Emergency.…
15.1.B.23-23-903 15 CAR § 23-903. Access
0.3K chars
15 CAR § 23-903. Access. (a) The owner or owner’s agent must provide Arkansas Natural Resources Commission personnel access to the dam during reasonable working hours for commission inspections. (b) Access during emergency conditions must be available to commission personnel.…
15.1.B.23-23-904 15 CAR § 23-904. Assistance by owner
0.4K chars
15 CAR § 23-904. Assistance by owner. (a) The owner or owner’s agent may be requested to provide limited assistance to Arkansas Natural Resources Commission personnel in performing inspections. (b) Requested assistance may include: (1) Operating gates, valves, and other controls;…
15.1.B.24-24-101 15 CAR § 24-101. Purpose
0.3K chars
15 CAR § 24-101. Purpose. (a) The purpose of this part is to establish the procedures for implementing the Arkansas Water Resource Agricultural Cost-Share Program. (b) This part is applicable to both the Arkansas Natural Resources Commission and conservation districts, when recei…
15.1.B.24-24-102 15 CAR § 24-102. Definitions
1.8K chars
15 CAR § 24-102. Definitions. The following definitions shall apply to this part: (1) “Agricultural cost-share program” means the program administered by the United States Department of Agriculture pursuant to 16 U.S.C. §§ 590g – q3, 7 C.F.R. pt. 701, and 1-AR(ACP)(Rev. 11) Part …
15.1.B.24-24-103 15 CAR § 24-103. District transfer of funds
0.5K chars
15 CAR § 24-103. District transfer of funds. (a) A district obtaining delegation under 15 CAR § 24-201 et seq., may by appropriate resolution of the board of directors transfer funds held for use under this part to the water conservation education and information fund created und…
15.1.B.24-24-201 15 CAR § 24-201. Memorandum of understanding
0.3K chars
15 CAR § 24-201. Memorandum of understanding. Any district wishing to obtain delegation of the agricultural cost-share program within its boundaries shall enter into a memorandum of understanding with the Arkansas Natural Resources Commission agreeing to abide by this part.…
15.1.B.24-24-202 15 CAR § 24-202. Annual plan
0.5K chars
15 CAR § 24-202. Annual plan. (a) Upon delegation, a district shall develop an annual plan in which it prioritizes water conservation activities within the district. (b) The district shall take this plan in account when considering applications for financial assistance under this…
15.1.B.24-24-203 15 CAR § 24-203. Report of activities
1.3K chars
15 CAR § 24-203. Report of activities. (a)(1) The district shall provide the Department of Agriculture a copy of the annual reports of cost-share activities within the district. (2) These reports shall be in a form acceptable to the Director of the Natural Resources Division of t…
15.1.B.24-24-204 15 CAR § 24-204. Financial records
0.4K chars
15 CAR § 24-204. Financial records. (a) A district obtaining delegation under this program shall establish and maintain a system of management and accounting for cost-share funds that is acceptable to the Director of the Natural Resources Division of the Department of Agriculture…
15.1.B.24-24-301 15 CAR § 24-301. Applicant in general
0.8K chars
15 CAR § 24-301. Applicant in general. (a) An applicant may be: (1) An individual; (2) A partnership; (3) A corporation; (4) A limited liability company; (5) A joint venture; (6) A watershed improvement district; (7) A drainage district; or (8) A regional water distribution distr…
15.1.B.24-24-302 15 CAR § 24-302. Applicant must be cooperator
0.3K chars
15 CAR § 24-302. Applicant must be cooperator. (a) An applicant must be a cooperator with the district in which the cost-share funds are to be expended. (b) If applicant is a joint venture, then all individuals shall be cooperators. (c) This section shall not be applicable to dra…
15.1.B.24-24-303 15 CAR § 24-303. Conservation plan on file
0.3K chars
15 CAR § 24-303. Conservation plan on file. (a) The farm on which the proposed project is located must have a current conservation plan on file with the district. (b) This conservation plan must identify the proposed practice or project as a solution to one (1) or more identified…
15.1.B.24-24-304 15 CAR § 24-304. Application period
0.3K chars
15 CAR § 24-304. Application period. Applications for agricultural cost-share funds shall be accepted during the months of October, November, December, and January, unless otherwise approved by the Director of the Natural Resources Division of the Department of Agriculture.…
15.1.B.24-24-305 15 CAR § 24-305. Application procedure
0.6K chars
15 CAR § 24-305. Application procedure. (a) Applications shall be made on forms provided by the district or Department of Agriculture and approved by the department. (b) Required information includes, but is not limited to, the following: (1) Name, address, and telephone number o…
15.1.B.24-24-306 15 CAR § 24-306. Application review
0.8K chars
15 CAR § 24-306. Application review. (a)(1) As soon as practicable after the close of the application period, the applications received shall be reviewed. (2) In making a decision concerning an application, consideration shall be given to the proposed project furtherance of: (A) …
15.1.B.24-24-307 15 CAR § 24-307. Additional technical information on highest-ranking applications
1.3K chars
15 CAR § 24-307. Additional technical information on highest-ranking applications. (a) The Director of the Natural Resources Division of the Department of Agriculture, for applications made to the Department of Agriculture, or the district board of directors, for applications mad…
15.1.B.24-24-308 15 CAR § 24-308. Consideration of applications
0.7K chars
15 CAR § 24-308. Consideration of applications. (a) The Director of the Natural Resources Division of the Department of Agriculture, on applications made to the Department of Agriculture, or the district board of directors, on applications made to a district, may approve, disappr…
15.1.B.24-24-309 15 CAR § 24-309. Limitation of cost-share participation
0.3K chars
15 CAR § 24-309. Limitation of cost-share participation. (a) Cost-share participation under this program is limited to sixty percent (60%) of allowable costs. (b) Total cost-share participation from all contributing sources, including federal, state, and local sources, is limited…
15.1.B.24-24-401 15 CAR § 24-401. Project design criteria
0.4K chars
15 CAR § 24-401. Project design criteria. All projects or practices shall be designed and installed in compliance with: (1) Current standards and technical specifications of the United States Department of Agriculture; or (2) Other standards and specifications approved by the Dir…
15.1.B.24-24-402 15 CAR § 24-402. Project design
0.4K chars
15 CAR § 24-402. Project design. All projects or practices shall be designed by an: (1) Employee of the: (A) United States Department of Agriculture; (B) District; or (C) Department of Agriculture; or (2) Arkansas-licensed professional engineer.…
15.1.B.24-24-403 15 CAR § 24-403. Final inspection
0.4K chars
15 CAR § 24-403. Final inspection. (a) Upon completion of the installation of a project or practice, an inspection shall be conducted by a representative of the district, Department of Agriculture, or United States Department of Agriculture to ensure the projects are installed in…