75 sections in this chapter.
COMAR 26.04.06.01 Purpose and Scope
1.7K chars
.01 Purpose and Scope. A. The purpose of this chapter is to establish requirements and control measures for the utilization of sewage sludge. B. These regulations specifically apply to all persons engaged in the following utilization activities of sewage sludge, or any product co…
COMAR 26.04.06.02 Incorporation by Reference
0.2K chars
.02 Incorporation by Reference. In this chapter, the following documents are incorporated by reference: A. 40 CFR §503.32, as amended; and B. 40 CFR §503.33, as amended.
COMAR 26.04.06.03 Definitions
18.3K chars
.03 Definitions. A. The following terms have the meanings indicated. B. Terms Defined. (1) “Aerobic digestion” means the biochemical decomposition of organic matter in sewage sludge by microorganisms in the presence of air. (2) “Agricultural land” means as defined in COMAR 15.20.…
COMAR 26.04.06.04 Right of Entry
1.6K chars
.04 Right of Entry. The person applying for a Sewage Sludge Utilization Permit shall agree, as a condition for the issuance of the permit or any other authorization or approval issued by the Department, to allow the Secretary of the Department of the Environment, the local health…
COMAR 26.04.06.05 Constituent Limits for Sewage Sludge
4.0K chars
.05 Constituent Limits for Sewage Sludge. A. Specific Constituent Limitations for Sewage Sludge. (1) The following constituent limitations apply to application of sewage sludge: (a) Bulk sewage sludge may not be applied to the land if the concentration of any constituent in the s…
COMAR 26.04.06.06 Sampling and Testing Requirements for a Sewage Sludge Generator
7.1K chars
.06 Sampling and Testing Requirements for a Sewage Sludge Generator. A. Except for owners or operators of on-site sewage disposal systems as defined in COMAR 26.04.02.02B(27), each sewage sludge generator shall submit to the Department the results of laboratory analysis of repres…
COMAR 26.04.06.07 Record-Keeping and Reporting Requirements for a Sewage Sludge Generator
2.4K chars
.07 Record-Keeping and Reporting Requirements for a Sewage Sludge Generator. A. Except for owners or operators of on-site sewage disposal systems as defined in COMAR 26.04.02.02B(27), each sewage sludge generator shall submit to the Department a complete and accurate generator’s …
COMAR 26.04.06.08 Sewage Sludge Generator Fees
5.2K chars
.08 Sewage Sludge Generator Fees. A. Each sewage sludge generator shall pay the Department an annual sewage sludge generator fee for each wet ton of sewage sludge generated by the sewage sludge generator during the previous calendar year as reported on the Sewage Sludge Generator…
COMAR 26.04.06.09 Sewage Sludge Utilization Permits
9.1K chars
.09 Sewage Sludge Utilization Permits. A. Except as provided under the provisions of §C of this regulation, a person may not engage in the following utilization activities of sewage sludge, or any product containing this material, without first obtaining a Sewage Sludge Utilizati…
COMAR 26.04.06.10 Performance Bonds, Liability Insurance, or Other Form of Security
5.5K chars
.10 Performance Bonds, Liability Insurance, or Other Form of Security. A. Except as provided under the provisions of §B of this regulation, a person applying for a Sewage Sludge Utilization Permit shall file with the Department a performance bond on a form prescribed or approved …
COMAR 26.04.06.11 Denial of Sewage Sludge Utilization Permit Application
2.1K chars
.11 Denial of Sewage Sludge Utilization Permit Application. A. The Department shall deny an application for a Sewage Sludge Utilization Permit if the Department finds that: (1) The person applying for a Sewage Sludge Utilization Permit cannot utilize sewage sludge without causing…
COMAR 26.04.06.12 Treatment Facility
2.6K chars
.12 Treatment Facility. A. The Department may issue a Sewage Sludge Utilization Permit to construct and operate a treatment facility to generate Class A or B sewage sludge and to market the Class A sewage sludge in Maryland if the person applying for a permit demonstrates that th…
COMAR 26.04.06.13 Treatment Facility — Permit Application Requirements
7.9K chars
.13 Treatment Facility — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where a sewage sludge treatment facility is to be located. A person shall submit to the Department six comple…
COMAR 26.04.06.14 Treatment Facility — Public and Local Government Participation Requirements for a Permit Application
3.2K chars
.14 Treatment Facility — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restrictions…
COMAR 26.04.06.15 Treatment Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
2.0K chars
.15 Treatment Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 10 years: (1) The source…
COMAR 26.04.06.16 Treatment Facility — Modifications of a Sewage Sludge Utilization Permit
2.8K chars
.16 Treatment Facility — Modifications of a Sewage Sludge Utilization Permit. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause. B. The De…
COMAR 26.04.06.17 Composting Facility
3.2K chars
.17 Composting Facility. A. The Department may not issue a Sewage Sludge Utilization Permit to install, materially alter, or materially extend a sewage sludge composting facility until: (1) The composting facility meets all zoning and local land use requirements of the county whe…
COMAR 26.04.06.18 Composting Facility — Permit Application Requirements
8.2K chars
.18 Composting Facility — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where a sewage sludge composting facility is to be installed, materially altered, or materially extended. A …
COMAR 26.04.06.19 Composting Facility — Public and Local Government Participation Requirements for a Permit Application
3.5K chars
.19 Composting Facility — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restriction…
COMAR 26.04.06.20 Composting Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
2.0K chars
.20 Composting Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 10 years: (1) The sourc…
COMAR 26.04.06.21 Composting Facility — Modifications, Material Alteration, or Extension
3.0K chars
.21 Composting Facility — Modifications, Material Alteration, or Extension. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by new law or regulation, to clarify permit conditions, or for other good cause. B. The Depart…
COMAR 26.04.06.22 Transportation
3.2K chars
.22 Transportation. A. The Department may issue a Sewage Sludge Utilization Permit to transport sewage sludge if the equipment to be used, the operation plan, and the destination of the sewage sludge meet the requirements established by the Department. B. Liquid sewage sludge may…
COMAR 26.04.06.23 Transportation — Permit Application Requirements
3.9K chars
.23 Transportation — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where sewage sludge is to be transported. A person shall submit to the Department six completed copies of the Sew…
COMAR 26.04.06.24 Transportation — Public and Local Government Participation Requirements for a Permit Application
1.0K chars
.24 Transportation — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restrictions on …
COMAR 26.04.06.25 Transportation — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
1.2K chars
.25 Transportation — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 10 years: (1) The source, ty…
COMAR 26.04.06.26 Transportation — Modifications of a Sewage Sludge Utilization Permit
2.6K chars
.26 Transportation — Modifications of a Sewage Sludge Utilization Permit. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause. B. The Depart…
COMAR 26.04.06.27 Storage Facility
5.9K chars
.27 Storage Facility. A. The Department may not issue a Sewage Sludge Utilization Permit to install, materially alter, or materially extend a sewage sludge storage facility until the storage facility meets all zoning and local land use requirements of the county where the storage…
COMAR 26.04.06.28 Storage Facility — Permit Application Requirements
9.0K chars
.28 Storage Facility — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where a sewage sludge storage facility is to be installed, materially altered, or materially extended. A person…
COMAR 26.04.06.29 Storage Facility — Public and Local Government Participation
1.1K chars
.29 Storage Facility — Public and Local Government Participation. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restrictions on a Sewage Sludge Utilization Permit, …
COMAR 26.04.06.30 Storage Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
1.3K chars
.30 Storage Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 10 years: (1) The source, …
COMAR 26.04.06.31 Storage Facility — Modifications, Material Alterations or Extensions
4.1K chars
.31 Storage Facility — Modifications, Material Alterations or Extensions. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause. B. The Depart…
COMAR 26.04.06.32 Distribution Facility
3.3K chars
.32 Distribution Facility. A. The Department may issue a Sewage Sludge Utilization Permit to install, materially alter, or materially extend a sewage sludge distribution facility if the person applying for a Sewage Sludge Utilization Permit demonstrates that the following conditi…
COMAR 26.04.06.33 Distribution Facility — Permit Application Requirements
7.4K chars
.33 Distribution Facility — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where a sewage sludge distribution facility is to be located. A person shall submit to the Department six …
COMAR 26.04.06.34 Distribution Facility — Public and Local Government Participation Requirements for a Permit Application
1.2K chars
.34 Distribution Facility — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restricti…
COMAR 26.04.06.35 Distribution Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
1.3K chars
.35 Distribution Facility — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 10 years: (1) The sou…
COMAR 26.04.06.36 Distribution Facility — Modifications, Material Alterations or Extensions
3.7K chars
.36 Distribution Facility — Modifications, Material Alterations or Extensions. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause. B. The D…
COMAR 26.04.06.37 Agricultural Land
10.3K chars
.37 Agricultural Land. A. The Department may issue a Sewage Sludge Utilization Permit to apply sewage sludge on agricultural land if the following requirements are met: (1) The sewage sludge has been classified by the Department as Class B sewage sludge and meets the applicable v…
COMAR 26.04.06.38 Agricultural Land — Permit Application Requirements
9.6K chars
.38 Agricultural Land — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where sewage sludge is to be applied on agricultural land, subject to the following: (1) Adjacent properties o…
COMAR 26.04.06.39 Agricultural Land — Public and Local Government Participation Requirements for a Permit Application
3.2K chars
.39 Agricultural Land — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restrictions …
COMAR 26.04.06.40 Agricultural Land — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
2.0K chars
.40 Agricultural Land — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 5 years: (1) The source, …
COMAR 26.04.06.41 Agricultural Land — Modifications of a Sewage Sludge Utilization Permit
2.8K chars
.41 Agricultural Land — Modifications of a Sewage Sludge Utilization Permit. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause. B. The Dep…
COMAR 26.04.06.42 Marginal Land
5.7K chars
.42 Marginal Land. A. The Department may issue a Sewage Sludge Utilization Permit to apply sewage sludge on a marginal land at rates up to 50 dry tons per acre if the following requirements are met: (1) The sewage sludge has been classified by the Department as Class B sewage slu…
COMAR 26.04.06.43 Marginal Land — Permit Application Requirements
6.8K chars
.43 Marginal Land — Permit Application Requirements. A. A person shall submit to the Department a separate Sewage Sludge Utilization Permit Application for each site where sewage sludge is to be applied on a marginal land, subject to the following: (1) Adjacent properties owned a…
COMAR 26.04.06.44 Marginal Land — Public and Local Government Participation Requirements for a Permit Application
3.1K chars
.44 Marginal Land — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or place restrictions on a…
COMAR 26.04.06.45 Marginal Land — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
1.6K chars
.45 Marginal Land — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 5 years: (1) The source, type…
COMAR 26.04.06.46 Marginal Land — Modifications of a Sewage Sludge Utilization Permit
2.6K chars
.46 Marginal Land — Modifications of a Sewage Sludge Utilization Permit. A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause. B. The Departm…
COMAR 26.04.06.47 Energy Generation or Incineration
1.9K chars
.47 Energy Generation or Incineration. A. The Department may issue a Sewage Sludge Utilization Permit to incinerate sewage sludge at a permitted waste- to- energy facility or an incinerator if: (1) The Refuse Disposal Permit holder for the waste-to-energy facility or incinerator …
COMAR 26.04.06.48 Energy Generation or Incineration — Permit Application Requirements
4.7K chars
.48 Energy Generation or Incineration — Permit Application Requirements. A. A Refuse Disposal Permit holder seeking a Sewage Sludge Utilization Permit to incinerate sewage sludge shall: (1) Submit to the Department a separate Sewage Sludge Utilization Permit Application for each …
COMAR 26.04.06.49 Energy Generation or Incineration — Public and Local Government Participation Requirements for a Permit Application
1.1K chars
.49 Energy Generation or Incineration — Public and Local Government Participation Requirements for a Permit Application. A. To provide a county or a municipal corporation, if appropriate, with an opportunity to consult with the Department about the decision to issue, deny, or pla…
COMAR 26.04.06.50 Energy Generation or Incineration — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit
1.6K chars
.50 Energy Generation or Incineration — Record-Keeping and Reporting Requirements for a Sewage Sludge Utilization Permit. A. The permittee shall generate a report containing the following information and maintain all documents used to generate the report for a period of 5 years: …