27,054 sections across 3,237 Maryland regulatory chapters.
COMAR 08.18.19.04 Patapsco River North Shore
2.8K chars
.04 Patapsco River North Shore. A. The Patapsco River north shore areas, with their corresponding speed limits, are set forth in §§B—E of this regulation. B. Bear Creek. (1) Upper Bear Creek encompasses the area beginning at a point, at or near Lat. 39° 15.085’ N., Long. 76° 29.3…
COMAR 08.18.19.05 Patapsco River — Francis Scott Key Bridge Construction Areas
1.1K chars
.05 Patapsco River — Francis Scott Key Bridge Construction Areas. A. The speed limit for the areas described in this regulation is 6 knots at all times. B. East Area. The east construction area encompasses all of the waters of the Patapsco River enclosed by a line beginning at a …
COMAR 08.18.20.01 Patuxent River
0.3K chars
.01 Patuxent River. The Patuxent River encompasses all the waters of the Patuxent River and its tributaries westerly of a line beginning at a point, at or near Lat. 38° 19.15’ N., Long. 76° 25.27’ W., then running 120° (True) to a point, at or near Lat. 38° 18.57’ N., Long. 76° 2…