19,388 sections across 2,525 Ohio regulatory chapters.
R.5501:2-7-02 Determination of incentive/disincentive time
0.6K chars
19.03 PDF: Prior to including incentive/disincentive provisions in a contract, the director shall conduct an engineering analysis in order to determine realistic critical and non-critical time frames. The time frames, including critically identified work phase, shall be clearly s…
R.5501:2-7-03 Determination of incentive/disincentive daily amount
0.5K chars
19.03 PDF: Prior to including incentive/disincentive provisions in a contract the director shall calculate on a per project basis a daily or fraction thereof incentive/disincentive amount considering: construction engineering inspection costs, departmental traffic control costs a…
R.5501:2-7-04 Maximum incentive/disincentive amount
0.5K chars
19.03 PDF: The director shall not pay more than five per cent of the total contract amount in incentive payments unless he/she determines that the work is so critical that a higher percentage is warranted. There shall be no cap placed upon the accruing disincentive amount unless …