255 sections in this chapter.
9VAC5-80-450 Acid rain compliance plan and compliance options.
5.0K chars
A. For each affected unit included in an acid rain permit application, a complete acid rain compliance plan shall include: 1. For sulfur dioxide emissions, a certification that, as of the allowance transfer deadline, the designated representative will hold allowances in the unit'…
9VAC5-80-460 Repowering extensions.
10.6K chars
A. This section shall apply to the designated representative of: 1. Any existing affected unit that is a coal-fired unit and has a 1985 actual sulfur dioxide emissions rate equal to or greater than 1.2 lbs/mmBtu; or 2. Any new unit that will be a replacement unit, as provided in …
9VAC5-80-470 Units with repowering extension plans.
2.6K chars
A. No later than January 1, 2000, the designated representative of a unit governed by an approved repowering plan shall submit to the administrator and the department: 1. Satisfactory documentation of a preliminary design and engineering effort. 2. A binding letter agreement for …