R.817.181 Support facilities.
0.8K chars
(a) Support facilities shall be operated in accordance with a permit issued for the mine or coal preparation plant to which it is incident or from which its operation results. (b) In addition to the other provisions of this Part, support facilities shall be located, maintained, a…
4VAC25-130-817.22 Topsoil and subsoil.
6.6K chars
(a) Removal. (1)(i) All topsoil shall be removed as a separate layer from the area to be disturbed, and segregated. (ii) Where the topsoil is of insufficient quantity or of poor quality for sustaining vegetation, the materials approved by the division in accordance with Paragraph…
4VAC25-130-817.41 Hydrologic-balance protection.
15.0K chars
(a) General. All underground mining and reclamation activities shall be conducted to minimize disturbance of the hydrologic balance within the permit and adjacent areas, to prevent material damage to the hydrologic balance outside the permit area, and to support approved postmini…