43,753 sections across 2,186 Washington regulatory chapters.
51-11C-51-11C-61021 Section A102.1—General.
1.0K chars
A102.1 General. Table A102.1 lists heat loss coefficients for the opaque portion of exterior ceilings below vented attics, vaulted ceilings and roof decks in units of Btu/h • ft2 • °F of ceiling.They are derived from procedures listed in the ASHRAE Fundamentals Handbook. Ceiling …
51-11C-51-11C-610211 Table A102.1—Default U-factors for ceilings.
0.9K chars
Table A102.1Default U-factors for Ceilings Standard FrameAdvanced FrameCeilings Below Vented Attics FlatBaffled R-190.0490.047 R-300.0360.032 R-380.0310.026 R-490.0270.020 R-600.0250.017Scissors Truss R-30 (4/12 roof pitch)0.0430.031 R-38 (4/12 roof pitch)0.0400.025 R-49 (4/12 ro…
51-11C-51-11C-61022 Section A102.2—Component description.
6.9K chars
A102.2 Component description. The four types of ceilings are characterized as follows:A102.2.1 Ceilings below a vented attic. Attic insulation is assumed to be blown-in, loose-fill fiberglass with a K-value of 2.6 h • ft2 • °F/Btu per inch. Full bag count for specified R-value is…
51-11C-51-11C-610221 Tables A102.2.4—Steel truss framed ceiling Uo values.
2.7K chars
Table A102.2.4(1)Steel Trussa Framed Ceiling UoCavity Truss Span (ft) R-value12141618202224262830323436190.10750.09910.09280.08780.08390.08070.07800.07570.07370.07200.07060.06930.0681300.09070.08230.07600.07100.06710.06380.06120.05890.05690.05520.05380.05250.0513380.08440.07590.0…
51-11C-51-11C-610225 Tables A102.2.5—Default U-factors for metal building roofs.
2.0K chars
Table A102.2.5Default U-factors for Metal Building Roofs Overall U-Factor for Assembly of Base Roof Plus ContinuousInsulation (uninterrupted by framing) Rated R-Value ofContinuous InsulationInsulationSystemRated R-Value ofInsulationOverall U-Factor for Entire Base RoofAssemblyR-6…
51-11C-51-11C-610226 Tables A102.2.6—Assembly U-factors for roofs with insulation entirely above deck.
4.4K chars
Table A102.2.6(1)Assembly U-factors for Roofs with Tapered Insulation Entirely Above Deck Single Slope Rectangular to One-sided,e,f,g,h(Uninterrupted by Framing) Rated R-value of Insulation at Maximum Condition (Rmaxc)151015202530354045505560Rated R-value of insulation at a Minim…
51-11C-51-11C-61030 Section A103—Above grade walls.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61030, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-61031 Section A103.1—General.
1.4K chars
A103.1 General. The tables in this section list heat loss coefficients for the opaque portion of above-grade wood stud frame walls, metal stud frame walls and concrete masonry walls (Btu/h • ft2 • °F). They are derived from procedures listed in the ASHRAE Fundamentals Handbook. F…
51-11C-51-11C-61032 Section A103.2—Framing description.
1.6K chars
A103.2 Framing description. For wood stud frame walls, three framing types are considered and defined as follows:A103.2.1 Standard. Studs framed on 16 inch centers with double top plate and single bottom plate. Corners use three studs and each opening is framed using two studs. H…
51-11C-51-11C-61033 Section A103.3—Component description.
0.4K chars
A103.3 Component description. Default coefficients for the following types of walls are listed: Single-stud walls, strap walls, double-stud walls, log walls, stress-skin panels, metal stud walls, and metal building walls.[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapte…
51-11C-51-11C-610331 Section A103.3.1—Single stud wall.
5.5K chars
A103.3.1 Single-stud wall. Tables A103.3.1(1) through A103.3.1(8): Assumes either 2 x 4 or 2 x 6 studs framed on 16 or 24 inch centers. Headers are solid for 2 x 4 walls and double 2x for 2 x 6 walls, with either dead-air or rigid-board insulation in the remaining space.TABLE A10…
51-11C-51-11C-610332 Section A103.3.2—Strap wall.
0.5K chars
A103.3.2 Strap wall. Table A103.3.2: Assumes 2 x 6 studs framed on 16 or 24 inch centers. 2 x 3 or 2 x 4 strapping is run horizontally along the interior surface of the wall to provide additional space for insulation.Table A103.3.22 x 6: Strap Wall Siding Material/Frame Type Lapp…
51-11C-51-11C-610333 Section A103.3.3—Double stud wall.
1.1K chars
A103.3.3 Double stud wall. Tables A103.3.3(1) and A103.3.3(2): Assumes an exterior structural wall and a separate interior, nonstructural wall. Insulation is placed in both wall cavities and in the space between the two walls. Stud spacing is assumed to be on 24 inch centers for …
51-11C-51-11C-610334 Section A103.3.4—Log wall.
0.5K chars
A103.3.4 Log wall. U-factors for log walls shall be determined using ICC 400 Table 305.3.1.1, U-Factor of log wall (UW) by log thickness (WL) and specific gravity.[Statutory Authority: RCW 19.27A.020, 19.27A.045, 19.27A.160 and chapter 19.27 RCW. WSR 20-01-047, § 51-11C-610334, f…
51-11C-51-11C-610335 Section A103.3.5—Stress skin panel.
0.4K chars
A103.3.5 Stress-skin panel. See Table A103.3.5.Table A103.3.5Stress Skin Panel PanelThickness,InchesU-factor NOTE: R-value of expanded polystyrene: R-3.85 per inchFraming: 6%Spline: 8% 3 1/20.071 5 1/20.048 7 1/40.037 9 1/40.030 11 1/40.025 No thermal bridging between interior an…
51-11C-51-11C-610336 Section A103.3.6—Metal stud walls.
6.8K chars
A103.3.6 Metal stud walls. The nominal R-values in Tables A103.3.6.1 through A103.3.6.3 may be used for purposes of calculating metal stud wall section U-factors in lieu of the ASHRAE zone calculation method as provided in Chapter 27 of the ASHRAE Fundamentals Handbook.A103.3.6.1…
51-11C-51-11C-610337 Section A103.3.7—Concrete and masonry walls.
13.9K chars
A103.3.7 Concrete and masonry walls.A103.3.7.1 Concrete masonry walls. The nominal R-values in Table A103.3.7.1 may be used for purposes of calculating concrete masonry wall section U-factors in lieu of the ASHRAE isothermal planes calculation method as provided in Chapter 27 of …
51-11C-51-11C-61040 Section A104—Below-grade walls and slabs.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61040, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-61041 Section A104.1—General.
1.9K chars
A104.1 General. Table A104.1 lists heat loss coefficients for below-grade walls and floors.Coefficients for below-grade walls are given as U-factors (Btu/h • ft2 • °F of wall area). Coefficients for below-grade slabs are listed as F-factors (Btu/h • ft • °F per lineal foot of sla…
51-11C-51-11C-61042 Section A104.2—Component description.
1.2K chars
A104.2 Component description. All below-grade walls are assumed to be 8 inch concrete. The wall is assumed to extend from the slab upward to the top of the mud sill for the distance specified in Table A104.1, with 6 inches of concrete wall extending above grade.Interior insulatio…
51-11C-51-11C-61043 Section A104.3—Insulation description.
0.7K chars
A104.3 Insulation description. Coefficients are listed for the following four configurations:1. Uninsulated: No insulation or interior finish.2. Interior insulation: Interior 2 x 4 insulated wall without a thermal break between concrete wall and slab.3. Interior insulation with t…
51-11C-51-11C-61050 Section A105—Floors over unconditioned space.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61050, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-61051 Section A105.1—General.
1.7K chars
A105.1 General. Tables A105.1(1), A105.1(2) and A105.1(3) list heat loss coefficients for floors over unconditioned spaces in units of Btu/h • ft2 • °F.They are derived from procedures listed in the ASHRAE Fundamentals Handbook, assuming an average outdoor temperature of 45°F, an…
51-11C-51-11C-61052 Section A105.2—Crawlspace description.
1.4K chars
A105.2 Crawlspace description. Four configurations are considered: Naturally ventilated crawlspace, mechanically vented crawlspace, heated plenum crawlspace and exposed floor.A105.2.1 Naturally ventilated crawlspaces. Assumed to have 3.0 air changes per hour, with at least 1.0 ft…
51-11C-51-11C-61053 Section A105.3—Construction description.
0.8K chars
A105.3 Construction description. Floors are assumed to be either joisted floors framed on 16 inch centers, or post and beam on 4 foot by 8 foot squares. Insulation is assumed to be installed under the subflooring between the joists or beams with no space between the insulation an…
51-11C-51-11C-61060 Section A106—On-grade slab floors.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61060, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-61061 Section A106.1—General.
0.9K chars
A106.1 General. Table A106.1 lists heat loss coefficients for heated on-grade slab floors, in units of Btu/h • °F per lineal foot of perimeter.Table A106.1Default F-factors for On-Grade SlabsInsulation TypeR-0R-5R-10R-15R-20R-30 Unheated Slab Uninsulated slab0.73—————2 ft. Horizo…
51-11C-51-11C-61062 Section A106.2—Component description.
0.5K chars
A106.2 Component description. All on-grade slab floors are assumed to be 6 inch concrete poured directly onto the earth. The bottom of the slab is assumed to be at grade line. Monolithic and floating slabs are not differentiated.Soil is assumed to have a conductivity of 0.75 Btu/…
51-11C-51-11C-61063 Section A106.3—Insulation description.
1.0K chars
A106.3 Insulation description. Coefficients are provided for the following three configurations:1. Two foot (or four foot) vertical: Insulation is applied directly to the slab exterior, extending downward from the top of the slab to a depth of 2 feet (or 4 feet) below grade.2. Tw…
51-11C-51-11C-61070 Section A107—Default U-factors for doors.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61070, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-61071 Section A107.1—Doors without NFRC certification.
0.3K chars
A107.1 Doors without NFRC certification. Doors that do not have NFRC certification shall be assigned the appropriate U-factor from Tables A107.1(1) through A107.1(4).[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61071, …
51-11C-51-11C-610711 Table A107.1(1)—Default U-factors for doors.
2.0K chars
Table A107.1(1)Default U-factors for DoorsDoor TypeNoGlazedFenestrationSingleGlazingDoubleGlazingwith 1/4 in.AirspaceDoubleGlazingwith 1/2in.AirspaceDoubleGlazingwithe = 0.10,1/2 in.ArgonSwinging Doors (Rough opening - 38 in. x 82 in.)Slab Doors Wood slab in wood framea0.46 6% gl…
51-11C-51-11C-610712 Table A107.1(2)—Default U-factors for revolving doors.
0.3K chars
Table A107.1(2)Default U-factors for Revolving DoorsRevolving DoorsSize (W x H)U-Factor3-wing8 ft. x 7 ft.10 ft. x 8 ft.0.790.804-wing7 ft. x 6.5 ft.7 ft. x 7.5 ft.0.630.64Open82 in. x 84 in.1.32[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WS…
51-11C-51-11C-610713 Table A107.1(3)—Default U-factors for steel emergency doors.
0.7K chars
Table A107.1(3)Default U-factors for Steel Emergency DoorsDouble-skin Steel Emergency Exit DoorsCore Insulation3 ft. x 6 ft. 8 in.6 ft. x 6 ft. 8 in.1-3/8 in. thicknessHoneycomb kraft paperMineral wool, steel ribsPolyurethane foam0.570.440.340.520.360.281-3/4 in. thicknessHoneyco…
51-11C-51-11C-610714 Table A107.1(4)—Default U-factors for steel garage and hangar doors.
1.6K chars
Table A107.1(4)Default U-factors for Steel Garage and Hangar DoorsDouble-skin Steel Garage and Aircraft Hangar Doors One-piece tilt-upaSectional tilt-upbAircraft hangarInsulatione8 ft. x 7 ft.16 ft. x 7 ft.9 ft. x 7 ft.72 ft. x 12 ft.c240 ft. x 50 ft.d1-3/8 in. thicknessXPS, stee…
51-11C-51-11C-61080 Section A108—Air infiltration.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-61080, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-61081 Section A108.1—General.
1.3K chars
A108.1 General. Tables A108.1(1) and A108.1(2) list effective air change rates and heat capacities for heat loss due to infiltration for Single-Family Residential.The estimated seasonal average infiltration rate in air changes per hour (ACH) is given for standard air-leakage cont…
51-11C-51-11C-70000 Appendix B—Default internal load values and schedules.
0.1K chars
[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-70000, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-71010 Section B101—General.
0.2K chars
B101.1 Scope. The following default internal load values and schedules shall apply to Section C407.[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-71010, filed 2/1/13, effective 7/1/13.]
51-11C-51-11C-71020 Section B102—Default tables of internal loads.
0.3K chars
B102 Default tables of internal loads. Default occupancy densities, receptacle power densities and service hot water consumption are included in Table B102.[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-71020, filed 2/1/…
51-11C-51-11C-71021 Table B102—Acceptable occupancy densities, receptacle power densities and service hot water consumption.
1.5K chars
Table B102Acceptable Occupancy Densities, Receptacle Power Densitiesand Service Hot Water ConsumptionaBuilding TypeOccupancy Densityb ft2/Person (Btu/h • ft2)Receptacle Power Densityc, Watts/ft2 (Btu/h • ft2)Service Hot WaterQuantitiesd Btu/h per personAssembly50 (4.60)0.25 (0.85…
51-11C-51-11C-71030 Section B103—Default schedules.
0.3K chars
B103 Default schedules. Default schedules for occupancy, lighting, receptacles, HVAC, service hot water, and elevators are included in Tables B103(1) through B103(10).[Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-71030,…
51-11C-51-11C-71031 Table B103(1)—Assembly occupancy.
2.1K chars
Table B103(1)Assembly Occupancya Schedule for OccupancySchedule for Lightingb/Receptacle Schedule for ServiceHot WaterSchedule forElevatorHour of Day (time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule for HVACSystemPercent ofMaximum LoadPercent ofMaximum Load WkSatSunWkSa…
51-11C-51-11C-71032 Table B103(2)—Health occupancy.
2.1K chars
Table B103(2)Health Occupancya Schedule for OccupancySchedule for Lightingb/Receptacle Schedule for ServiceHot WaterSchedule for ElevatorHour of Day(time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule for HVAC SystemPercent ofMaximum LoadPercent ofMaximum Load WkSatSunWkSat…
51-11C-51-11C-71033 Table B103(3)—Hotel/motel occupancy.
2.1K chars
Table B103(3)Hotel/Motel Occupancya Schedule forOccupancySchedule for Lighting/Receptacle Schedule for ServiceHot WaterSchedule for ElevatorHour of Day(time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule for HVACSystemPercent ofMaximum LoadPercent ofMaximum Load WkSatSunWkS…
51-11C-51-11C-71034 Table B103(4)—Light manufacturing occupancy.
2.1K chars
Table B103(4)Light Manufacturing Occupancya Schedule forOccupancySchedule for Lightingb/Receptacle Schedule for ServiceHot WaterSchedule for ElevatorHour of Day(time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule for HVAC SystemPercent ofMaximum LoadPercent ofMaximum Load W…
51-11C-51-11C-71035 Table B103(5)—Office occupancy.
2.0K chars
Table B103(5)Office Occupancya Schedule forOccupancySchedule for Lightingb/Receptacle Schedule for ServiceHot WaterSchedule for ElevatorHour of Day(time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule for HVACSystemPercent ofMaximum LoadPercent ofMaximum Load WkSatSunWkSatSu…
51-11C-51-11C-71036 Table B103(6)—Parking garage occupancy.
2.5K chars
Table B103(6)Parking Garage OccupancyaHour of Day(time)Schedule forOccupancyPercent ofMaximum LoadSchedule forLightingb/ReceptaclePercent ofMaximum LoadSchedule forHVAC SystemSchedule forService Hot WaterPercent ofMaximum LoadSchedule forElevatorPercent ofMaximum Load WkSatSunWkS…
51-11C-51-11C-71037 Table B103(7)—Restaurant occupancy.
2.2K chars
Table B103(7)Restaurant Occupancya Schedule forOccupancySchedule for Lightingb/Receptacle Schedule for Service Hot WaterSchedule for ElevatorHour of Day(time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule forHVAC SystemPercent ofMaximum LoadPercent ofMaximum Load WkSatSunWk…
51-11C-51-11C-71038 Table B103(8)—Retail occupancy.
2.2K chars
Table B103(8)Retail Occupancya Schedule forOccupancySchedule forLightingb/Receptacle Schedule for Service Hot WaterSchedule forElevatorHour of Day (time)Percent ofMaximum LoadPercent ofMaximum LoadSchedule for HVAC SystemPercent ofMaximum LoadPercent ofMaximum Load WkSatSunWkSatS…