NR-108-108.03 Construction of reviewable projects
1.6K chars
NR 108.03 Construction of reviewable projects. (1) No person may commence, or cause to be commenced, construction of any reviewable project until final plans and specifications for such project have been reviewed and approved by the department or until at least 90 days has elapse…
NR-108-108.04 Plans for reviewable projects
8.8K chars
NR 108.04 Plans for reviewable projects. (1) PRELIMINARY PLANS. Prior to preparation of final plans and specifications for a water supply facility, an industrial wastewater facility or industrial pretreatment facility, a conceptual design report of the proposed system may be subm…
NR-108-108.05 Design requirements
1.3K chars
NR 108.05 Design requirements. (1) Final plans and specifications shall incorporate accepted engineering practices. If new or innovative equipment or methods are proposed in the plans, sufficient data, based upon practical application, experimental or otherwise, shall be submitte…