NR-110-110.15 General requirements for sewage treatment facilities
23.6K chars
NR 110.15 General requirements for sewage treatment facilities. (1) DESIGN REPORT. A design report shall be submitted with plans and specifications for all sewage treatment facilities. This report shall summarize the design hydraulic loading, design biochemical oxygen demand (BOD…
NR-110-110.17 Grit removal facilities
3.6K chars
NR 110.17 Grit removal facilities. (1) APPLICABILITY. Grit removal facilities are recommended for all sewage plants and are required for plants receiving sewage from combined sewers or from sewer systems receiving substantial amounts of grit. the chapter was last published. 23 DE…
NR-110-110.18 Settling tanks
6.1K chars
NR 110.18 Settling tanks. (1) DESIGN CONSIDERA(a) Multiple settling tanks. 1. Multiple settling tanks shall be provided at all sewage treatment plants with an average design flow which exceeds 1,890 cubic meters per day (0.5 million gallons per day). 2. Control appurtenances such…