Bonneville Power Administration (BPA)

HQ US · Oregonwebsite ↗

Bonneville Power Administration (Portland, Oregon; US federal agency under DOE; ~$3.5B annual revenues) is the federal power marketing agency for the Columbia River hydropower system — operating 31 hydro projects (31 federal dams including Grand Coulee and Bonneville Dam) with ~22,000 MW capacity. BPA is the historical electricity supplier for Pacific Northwest aluminum smelting, which once consumed ~40% of BPA power. Historical aluminum smelter customers include Kaiser Aluminum (Mead, Trentwood), Alcoa (Vancouver WA, Wenatchee), Columbia Falls Aluminum, and others. Most PNW aluminum smelters have since closed (power price competition from spot markets), with BPA transitioning toward grid management and wind/transmission. BPA's Columbia River grid (WECC/Western Interconnection) remains critical infrastructure for Pacific Northwest industrial consumers and is a major transmission backbone for western US.

1

Inputs supplied

1

Goods downstream

1

Facilities

0

Stories

What they make

1 input Bonneville Power Administration (BPA) supplies

Click an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods downstream

Essential goods that depend on something Bonneville Power Administration (BPA) makes, pick one to see the full supply chain.

What else they do

Business segments

The company's full revenue map, where this supply-chain role fits within their broader business.

  • Federal Hydropower Marketing

    70%
  • Transmission Services

    25%
  • Energy Efficiency & Demand Response

    5%

Intelligence

What's known

Sourced claims about this company's role in supply chains, chokepoints, concentration, incidents, dual-use connections.

  • Did you know2024

    BPA is a power utility, but the Columbia River dams it markets also determine Pacific salmon survival. Federal court orders and tribal treaty rights require BPA to "spill" (release water through spillways rather than turbines) for juvenile salmon migration each spring and fall, reducing electricity generation and costing BPA tens of millions in foregone revenue annually. The same infrastructure that powers Microsoft's and Amazon's Pacific Northwest data centers (tech supply chain) is legally required to support salmon runs that underpin Indigenous treaty fisheries (food sovereignty), recreational fishing (tourism), and Pacific coast commercial salmon harvest (food supply). The electricity supply chain and the salmon food supply chain are in perpetual legal and operational conflict at every Columbia River dam.

    Bonneville Power Administration
  • Origin2023

    BPA was created by the Bonneville Project Act of 1937 under President Roosevelt's New Deal as a federal agency to market electricity from the Bonneville Dam. Grand Coulee Dam (completed 1942) was the largest hydroelectric project in the world at the time and was crucial to WWII industrial production: BPA's cheap power enabled Kaiser Aluminum's Pacific Northwest smelters that produced the aluminum for wartime aircraft. The Columbia River system was specifically built at the US government level to power industrial mobilization — BPA is one of the clearest examples of federal infrastructure investment shaping industrial supply chains.

    Bonneville Power Administration