Facility

Eco Material Plant Bowen Legacy Ash Harvest (Georgia)

Operated by Eco Material Technologies (now CRH)US · Bartow County, Georgiachemical_plant

Legacy ash harvesting project at Georgia Power's Plant Bowen (Bartow County, GA) — the US's largest coal plant by generation. Eco Material targets 600,000 t/yr of processed fly ash from a 9-million-ton deposit for 15 years. This is the largest single fly ash harvesting project in the US and a proof-of-concept for commercializing the 1.3 billion tons of ponded ash in US impoundments.

1

Inputs produced

1

Goods downstream

0

Incidents on record

0

Stories

What's produced here

1 input from this facility

Tap an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods that depend on this facility