Facility

Langeled Pipeline (Norway–UK, Equinor)

Operated by Equinor ASAGB · North Seapipeline

Langeled pipeline: 1,166 km from Nyhamna terminal (Møre og Romsdal, Norway) via Sleipner Riser to Easington Gas Terminal (East Yorkshire, England). Operator: Gassco; technical service provider: Equinor. Annual capacity: 25.5 Bcm (900 Bcf). Became a critical strategic asset during 2022 European energy crisis — maximum capacity utilization sustained as Russian pipeline gas was cut. Supplies natural gas to UK and Northern European glass furnace networks. Source: https://en.wikipedia.org/wiki/Langeled_pipeline

1

Inputs produced

1

Goods downstream

0

Incidents on record

0

Stories

What's produced here

1 input from this facility

Tap an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods that depend on this facility