Title 16 › CHAPTER 12 — FEDERAL REGULATION AND DEVELOPMENT OF POWER › SUBCHAPTER II — REGULATION OF ELECTRIC UTILITY COMPANIES ENGAGED IN INTERSTATE COMMERCE › § 824a–2
The Secretary of Energy, working with the Federal Energy Regulatory Commission, must do a study on how reliable the electric system should be to meet customers’ needs. The study must look at the best ways to reach that reliability and how much those ways cost. It must also look at what to do during an emergency power outage to keep people safe and reduce economic harm, and how much those emergency plans cost. The study must be finished and sent to the President and Congress not later than 18 months after November 9, 1978, and the public must be allowed to comment before it is sent. The study must consider the cost and environmental effects of spending on generation, transmission, distribution, and customer devices; different kinds of utility systems and the reliability each might need; options other than new power plants (including conservation); whether many small generators are cost-effective compared to a few large ones; and any industry reliability standards for equipment, operations, training, and outage measures. The Secretary may ask regional reliability councils or other agencies to examine issues and report back, and must include any recommendations and utilities’ actions in the annual report.
Full Legal Text
Conservation, Source: USLM XML via OLRC
Legislative History
Reference
Citation
16 U.S.C. § 824a–2
Title 16, Conservation
Last Updated
Sep 22, 2026
Release point: 119-110