OregonSB 11542025 Regular SessionSenateWALLET

Relating to ground water.

Sponsored By: Sponsor information unavailable

Signed by Governor

Personalized for You

How does this bill affect your finances?

Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Bill Overview

Analyzed Economic Effects

11 provisions identified: 6 benefits, 0 costs, 5 mixed.

More help paying for septic repairs

Oregon expands grants, loans, and other help for eligible septic repairs, replacements, upgrades, system evaluations, and waste-well replacements. Projects must protect water quality or address health and safety risks; short-term lodging properties are excluded. Priority goes to programs serving low- and moderate-income households, housing providers, small-business owners lacking traditional financing, and designated groundwater areas. Eligible small businesses generate less than 3,500 gallons of wastewater daily. Loans cover 100% of eligible costs unless borrowers request and agree to less; lender liens must rank behind borrowers' mortgage liens. When a property must connect to an available sewer, assistance must fund that connection. Help depends on eligibility and available funding.

Water users face meters and safety rules

Oregon may treat groundwater contamination in designated areas as a serious water-management problem when needed to protect public health. When accurate use data is needed, the state may require water-right owners to install total-use meters and file annual reports. It must first hold a local hearing and allow alternatives; this authority cannot require meters for legally exempt groundwater uses. Water officials must require compliance with backflow-prevention rules in management areas. The state may also set and enforce surface-water backflow standards in concern or management areas.

Rural homes gain water service options

Counties may provide water or wastewater service to homes outside urban growth boundaries in declared concern or management areas. They may also contract with cities or districts to provide it, but service is not required. Needed facilities and service lines are allowed in exclusive farm-use zones, including counties with specified older marginal-lands rules. Providing service does not authorize urban rezoning or justify an exception to state land-use planning requirements.

Contamination triggers state action for well users

Oregon must recommend concern-area status for confirmed contamination linked partly to suspected nonpoint sources when statutory warning signs appear. Those signs include significant effects on wells or other sensitive sites, sources needing investigation, or likely threshold breaches within 20 years. Health officials must also recommend concern-area status for persistent, widespread drinking-groundwater contamination linked partly to suspected nonpoint sources. Nitrate above 70% of its statutory benchmark, or another contaminant above 50%, triggers health-agency notice and, after environmental confirmation, a management-area recommendation. Recommendations require accredited-lab results, quality-assured data, and published methods; declarations identify contaminants and potentially affected aquifers.

Public systems can replace abandoned wells

Public water systems in management areas can seek groundwater permits to replace qualifying abandoned-well supplies for expanded group domestic use. Approved amounts must match those supplies, capped at 5,000 gallons per abandoned well daily unless state rules raise the cap. The replacement well's effect on connected surface waters must be similar to or less than the abandoned wells' combined effect. Initial review presumes public welfare, safety, and health protection and skips water-availability review; specified proposed-order findings may also be omitted. These special review rules do not guarantee approval.

State teams must plan groundwater cleanup

After a concern or management area is declared, the Governor must name a lead agency and state response team. Concern-area work includes source assessments, monitoring, outreach, public contamination information, and county and local committee input. Management-area plans must identify harmful practices, alternatives, mandatory actions, schedules, progress checks, and needed land-use changes. Draft action plans receive 60 days of public comment; final plans are due within 90 days afterward. Agencies must coordinate and start needed rulemaking within 180 days after the final action plan. The environmental department coordinates groundwater work and provides project staff only as directed by the lead agency. Agencies may use concern-area pollution-control powers in management areas even without an earlier concern designation.

Well users get health response plans

In concern areas, Oregon health officials must assess risks to domestic-well users and public water systems and estimate response costs. They must prepare accessible, language-appropriate guidance on health risks, well testing, and safety; distribution depends on available resources. In management areas, officials must develop and carry out a public-health response plan with local health authorities. They must prepare a preliminary assessment if none exists. The completed plan goes to the Governor and legislative budget committee with needed funding requests; no funding amount is set.

Home sewage inspections include repair protections

Oregon must gather available sewage-system information and encourage voluntary inspections under its groundwater assessment plans. In declared management areas, inspectors may inspect home sewage systems that available evidence identifies as possible significant contamination sources. They must notify owners and residents, try to arrange a convenient time, and provide help information; refused entry requires court action. For violations found through these inspections, the state must give written notice, repair resources, and reasonable repair time before civil penalties. Low-income households get extensions when repair-aid applications are denied for lack of funds or remain pending and may be approved.

Farms get support and tighter pollution rules

Oregon must review voluntary farm practices, prioritize affected watersheds, and provide local technical support where feasible. In management areas, agriculture officials must adopt needed contaminant-control rules consistent with the action plan and may offer stewardship agreements. Agencies cannot issue general wastewater discharge or disposal permits to new large confined livestock operations applying waste within those areas. Stormwater permits are excluded from that ban. Anyone applying confined livestock waste there needs a nutrient application permit unless a qualifying discharge or disposal permit authorizes it. Nutrient permit holders must give a copy to the operation supplying the waste.

Groundwater controls continue until cleanup safeguards

Existing management-area declarations continue under the law, and lead agencies may credit earlier work to avoid duplicate requirements. Once contamination no longer exceeds management-area thresholds, the commission decides whether to replace management status with concern-area status. Before that change, environmental officials must find that a new or revised voluntary local plan can work without state enforcement. Agencies may end mandatory controls only after the local committee produces a plan the state team finds workable without enforcement.

Well users gain local planning seats

Concern-area committees must balance local interests and have at least seven members, including two homeowners or tenants using affected drinking-water wells. Committees develop voluntary local plans consistent with state plans, with 30 days for public comment. They have 120 days after receiving the draft agency plan to comment; management-area committees advise agencies on local action plans. Committees preparing voluntary plans may seek grants for staff or committee expenses. Across the groundwater project grant pool, no more than one-third may fund projects directly tied to management-area issues.

Sponsors & Cosponsors

Sponsors

There is no primary sponsor on record.

Cosponsors

  • Natural Resources and Wildfire

    Affiliation unavailable

Roll Call Votes

All Roll Calls

Yes: 68 • No: 26

House vote • 6/27/2025

Third reading as Special Order of Business. Carried by Helm. Passed.

Yes: 39 • No: 11

House vote • 6/23/2025

Rules: Heard and Reported Out

Yes: 4 • No: 0

Senate vote • 6/17/2025

Third reading. Carried by Taylor. Passed.

Yes: 18 • No: 12

Senate vote • 6/10/2025

Rules: Heard and Reported Out with Amendments

Yes: 3 • No: 2

Senate vote • 4/8/2025

Natural Resources and Wildfire: Heard and Reported Out with Amendments

Yes: 4 • No: 1

Actions Timeline

  1. Effective date, January 1, 2026.

    8/8/2025Senate
  2. Chapter 605, 2025 Laws.

    8/8/2025Senate
  3. Governor signed.

    7/24/2025Senate
  4. Speaker signed.

    6/30/2025House
  5. President signed.

    6/30/2025Senate
  6. Third reading as Special Order of Business. Carried by Helm. Passed.

    6/27/2025House
  7. Rules suspended. Made a Special Order of Business immediately.

    6/27/2025House
  8. Carried over to June 27, 2025 Calendar.

    6/26/2025House
  9. Third reading.

    6/26/2025House
  10. Rules suspended. Carried over to June 26, 2025 Calendar.

    6/25/2025House
  11. Rules suspended. Carried over to June 25, 2025 Calendar.

    6/24/2025House
  12. Second reading.

    6/23/2025House
  13. Recommendation: Do pass.

    6/23/2025House
  14. Work Session held.

    6/23/2025House
  15. Public Hearing held.

    6/19/2025House
  16. Referred to Rules.

    6/17/2025House
  17. First reading. Referred to Speaker's desk.

    6/17/2025House
  18. Third reading. Carried by Taylor. Passed.

    6/17/2025Senate
  19. Second reading.

    6/16/2025Senate
  20. Recommendation: Do pass with amendments to the A-Eng. bill. (Printed B-Eng.)

    6/13/2025Senate
  21. Work Session held.

    6/10/2025Senate
  22. Public Hearing held.

    6/9/2025Senate
  23. Referred to Rules by Order of the President.

    4/17/2025Senate
  24. Recommendation: Without recommendation as to passage but w/amendments and requesting referral to Rules. (Printed A-Eng.)

    4/17/2025Senate
  25. Public Hearing and Work Session held.

    4/8/2025Senate

Bill Text

  • SRULES Amendment -A3 (Adopted)

    6/10/2025

  • SRULES Amendment -A3 (Proposed)

    6/9/2025

  • SNRW Amendment -1 (Adopted)

    4/8/2025

  • A-Engrossed

  • B-Engrossed

  • Enrolled

  • Introduced

  • Senate Amendments to A-Engrossed

  • Senate Amendments to Introduced

Related Bills

Back to State Legislation