All Roll Calls
Yes: 63 • No: 74
Sponsored By: Anne E Watson (Democrat/Progressive)
Signed by Governor
Personalized for You
Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
5 provisions identified: 0 benefits, 2 costs, 3 mixed.
Original connection general-permit applications and major changes carry a one-time fee based on the higher planned water or wastewater flow. The fee is $250 below 2,000 gallons per day. It is $2,500 from 2,000 through 6,500 gallons per day, and $5,000 above 6,500. Beginning July 1, 2026, the law removes the $50 fee cap for qualifying projects in designated neighborhoods. Those projects must have an approved municipal sewer-capacity allocation; the repeal itself sets no replacement fee.
Beginning January 1, 2028, some exemptions for changing planned water or wastewater flow at existing buildings end. Owners making those changes can no longer use the repealed exemptions. Their projects remain subject to other applicable requirements.
Vermont’s permit rules cover public water and sewer connections of any size, but exclude plumbing inside buildings. Soil-based wastewater disposal systems fall under this chapter when planned flow is below 6,500 gallons per day. The state must publish a connection general permit and capacity guidance manual by December 1, 2027. It begins accepting connection certifications on January 1, 2028, and must accept applications certified by licensed designers and give them deference. Optional general permits can cover subdivisions without existing buildings, boundary changes, and systems below 1,000 gallons per day. Small water systems cannot need a variance, groundwater analysis, or yield testing. Small wastewater systems cannot need a variance or groundwater analysis; alternative technology requires the Secretary’s permission.
Qualified towns can review projects connecting to both municipal water and sewer systems when they own and control the lines. Towns requesting full connection-review authority need local legislative approval and must meet the Secretary’s written requirements. They must retain a licensed designer, confirm capacity, follow the general permit, respect designer deference, enforce rules, and report annually. State oversight remains, and prior broader delegation authority is removed. Towns can charge applicants for review costs; the town pays the state $100 when submitting project records, without a required applicant pass-through.
Public treatment-plant owners can receive authority to regulate wastewater pretreatment after EPA authorization and an agreement with the state. The Secretary must notify the Legislature when EPA authorization occurs. Plant owners can enforce federal requirements, set application and other fees, and impose civil, criminal, or administrative penalties. The Environmental Division can review their actions and hear appeals.
Anne E Watson
Democrat/Progressive • Senate
There are no cosponsors for this bill.
All Roll Calls
Yes: 63 • No: 74
House vote • 5/19/2026
Which was disagreed to on a Roll Call Failed -- Needed 69 of 137 to Pass -- Yeas = 63, Nays = 74
Yes: 63 • No: 74 • Other: 1
Senate Message: Signed by Governor June 18, 2026
Signed by Governor on June 18, 2026
Delivered to Governor on June 12, 2026
Senate Message: House proposal of amendment concurred in
Rules suspended & messaged to House forthwith, on motion of Senator Baruth
As passed by Senate and House
House proposal of amendment concurred in
House proposal of amendment; text
Rules suspended & taken up for immediate consideration, on motion of Senator Baruth
House proposal of amendment
Entered on Notice Calendar
House message: House passed bill in concurrence with proposal(s) of amendment
Read third time and passed in concurrence with proposal of amendment
Action Calendar: Third Reading
Third Reading ordered
Report of Committee on Environment, as amended, agreed to
Rep. Greer of Bennington and Chapin of East Montpelier moved to amend the report of the Committee on Environment, as amended, which was agreed to
Which was disagreed to on a Roll Call Failed -- Needed 69 of 137 to Pass -- Yeas = 63, Nays = 74
Rep. Nelson of Derby demanded yeas and nays
Rep. Tagliavia of Corinth, Greer of Bennington, and Lipsky of Stowe moved to amend the report of the Committee on Environment, as amended
Rep. Olson of Starksboro asked and was granted leave to withdraw amendment
Rep. Olson of Starksboro moved to amend the report of the Committee on Environment, as amended
Report of the Committee on Environment amended as recommended by the Committee on Ways and Means
Rep. Burkhardt of South Burlington recommended for the Committee on Ways and Means
Rep. North of Ferrisburgh reported for the Committee on Environment
As Enacted (ACT 174)Opens in a new window
6/19/2026
As Passed by Both Chambers
6/4/2026
As Passed by Both Chambers (Unofficial)
6/4/2026
House Proposal of Amendment
5/27/2026
House Proposal of Amendment (Unofficial)
5/27/2026
As Passed by the Senate
3/18/2026
As Passed by the Senate (Unofficial)
3/18/2026
As Introduced
1/6/2026
S.232, An act relating to public libraries and the Department of Libraries
S.197, An act relating to reform for primary care
S.198, An act relating to the regulation of tobacco products and tobacco substitutes
S.202, An act relating to plug-in photovoltaic devices
S.227, An act relating to creating immigration protocols in Vermont schools
S.214, An act relating to the provision of prekindergarten education in geographically isolated school districts