Facility

Sinopec Yanshan Meltblown Facility

Sinopec built its first meltblown nonwoven production line in 12 days (vs. typical 6-month timeline) in March 2020; Yanshan facility alone can produce 4 tonnes/day meltblown (= 1.2M N95s/day). Eight additional lines commissioned at Yizheng, Jiangsu in April 2020. Exemplifies China's ability to rapidly scale critical PPE inputs.

1

Inputs produced

1

Goods downstream

0

Incidents on record

0

Stories

What's produced here

1 input from this facility

Tap an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods that depend on this facility