Sinopec Yanshan Meltblown Facility
Sinopec built its first meltblown nonwoven production line in 12 days (vs. typical 6-month timeline) in March 2020; Yanshan facility alone can produce 4 tonnes/day meltblown (= 1.2M N95s/day). Eight additional lines commissioned at Yizheng, Jiangsu in April 2020. Exemplifies China's ability to rapidly scale critical PPE inputs.