GRID Savings Act of 2026
Sponsored By: Senator Heinrich, Martin [D-NM]
Introduced
Summary
FERC jurisdiction over large-load interconnections. This bill creates a federal rulebook for connecting very large nonresidential electric loads to the interstate transmission grid and sets who pays, how studies run, and how projects are tracked. It defines a "covered large load" as an aggregate peak demand of at least 150 megawatts behind a single point of interconnection and preserves an exclusion for ERCOT.
Personalized for You
How does this bill affect your finances?
Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Bill Overview
Analyzed Economic Effects
2 provisions identified: 0 benefits, 1 costs, 1 mixed.
Big customers pay hookup costs
This bill would make very large nonresidential loads (150 megawatts or more behind one point) subject to special interconnection cost rules. Peak demand would be measured without reducing for on-site generation or storage. Tariffs would assign 100% of Interconnection Facilities and Direct Assignment Facility costs to the covered large-load customer. Network Upgrade costs would also be allocated to the covered customer but credited back against transmission service charges. Covered customers could elect to build upgrades themselves and would need to provide payment or financial security to protect other customers.
FERC rules for very large loads
This bill would give FERC authority over how very large nonresidential loads connect to interstate transmission. FERC would have one year to write final interconnection rules that include model contract terms, study timelines, and payment and financial-security requirements. The rules would create an option for a covered large customer to voluntarily fund regional or interregional transmission projects to secure transmission service, but that funding would not change whether a project is selected. The section would not apply to the Texas-only grid (ERCOT).
Sponsors & CoSponsors
Sponsor
Heinrich, Martin [D-NM]
NM • D
Cosponsors
There are no cosponsors for this bill.
Roll Call Votes
No roll call votes available for this bill.