Arcelor Olaberria stops its large furnace for the first time in its history due to low river flow in the Oria
Low flow in the Oria has halted Arcelor Olaberria's large furnace, cutting steel output.
Source →The trace
How it reaches your house.
Starting from Industrial oxygen (99.5% purity), we walked the supply graph hop by hop to the goods you buy and the companies you own. Each step is the engine’s reasoning, scored for confidence and cited where a source backs it.
First impact
Rocky Mountain Steel / Orion Steel (Atlas Holdings) →Shortage riskHeavy Steel Rail (136 lb/yd Standard)
Orion Steel is a major 45%-share supplier of 136 lb/yd heavy steel rail, and the low substitutability plus 18-month replacement lead time mean a production disruption would materially tighten rail availability.
68% confidenceSaint-Gobain PAM →Shortage riskDuctile iron pipe and fittings (DIP)
If the shock has reached Saint-Gobain PAM, a production hit would tighten its DIP supply; the effect is tempered by only 10% market share and moderate substitutability.
34% confidenceHop 2
Ductile iron pipe and fittings (DIP) →Shortage risk
Where it lands
What you buy, and what you own.
Goods you buy
Water infrastructure supplies · Rail and freight infrastructure
In the MyPRIA app, this is checked against your own holdings.