Producer

HeidelbergMaterials AG

HEIDELB.DEHQ DE · Heidelbergwebsite ↗

Global building materials company (~121 Mt/yr cement capacity); owns Lehigh Hanson (US), Hanson (UK), Italcementi (Italy). Operates world's first commercial-scale cement CCS plant at Brevik, Norway (commissioned June 2025, 400,000 t CO₂/yr).

2

Inputs supplied

1

Goods downstream

3

Facilities

0

Stories

What they make

2 inputs HeidelbergMaterials AG supplies

Click an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods downstream

Essential goods that depend on something HeidelbergMaterials AG makes, pick one to see the full supply chain.

What else they do

Business segments

The company's full revenue map, where this supply-chain role fits within their broader business.

  • Cement

    50%
  • Aggregates

    25%
  • Ready-Mix Concrete + Asphalt

    20%
  • Circular Economy

    5%

Intelligence

What's known

Sourced claims about this company's role in supply chains, chokepoints, concentration, incidents, dual-use connections.

  • Did you know2025

    HeidelbergMaterials commissioned the world's first commercial-scale carbon capture and storage (CCS) plant at a cement factory in Brevik, Norway in June 2025 — capturing 400,000 tonnes of CO2 per year from the cement kiln exhaust. The captured CO2 is compressed, liquefied, and shipped by tanker to offshore geological storage sites under the North Sea. This milestone matters because cement calcination CO2 (limestone heating: CaCO3 → CaO + CO2) is chemical — not combustion — and cannot be eliminated by switching to renewable electricity. CCS is the only technologically viable path to net-zero cement. The Brevik plant was funded partly by the Norwegian government (which provided substantial grants as part of the Longship CCS project). A German cement company funded by Norway's sovereign wealth fund is demonstrating the technology the entire cement industry needs to decarbonize. The CO2 shipping infrastructure (liquid CO2 tankers from Norway to offshore storage) is a new supply chain that does not currently exist at commercial scale — HeidelbergMaterials is simultaneously a cement company and a CO2 logistics operator.

    HeidelbergMaterials AG
  • Capacity2025

    HeidelbergMaterials' Brevik plant in Norway, commissioned June 2025, is the world's only commercial-scale cement CCS facility. It captures 400,000 tonnes of CO₂/year (~50% of plant emissions) using SLB Capturi technology, with CO₂ liquefied and shipped to North Sea geological storage under Norway's Longship project. No other cement company has replicated this at commercial scale.

    Renewable Matter